
Sydney's Super Tunnel
Non notée
Année : 2020
Nombre de saisons : 2
Durée moyenne d'un épisode : 50 minutes
Genre(s) : Documentaire
The story of the Sydney Metro's construction and the complex challenges faced by the people involved as they deliver the massive project for the NSW Government — the greatest public transport project in Australia's history.
Saisons

Saison 1

Saison 2
Épisodes
Choisissez votre saison au dessus et découvrez les épisodes qui vous attendent !
Épisode 1 - Action Stations
12 août 2020
The show kicks off with a dynamic taster of what the series has in store - namely the inside story of a crack team building a trailblazing, fully-automated metro system costing $50 billion, by far the biggest and most advanced new railway opening anywhere on the planet in 2019. A dramatic scene with our main characters dealing with a crisis gets the ball rolling.
Épisode 2 - What Lies Beneath
19 août 2020
We check in on our engineers encountering all manner of issues tunneling through a minefield of existing infrastructure - skyscraper footings and basements, sewers, a graveyard, and existing rail tunnels.
Épisode 3 - Digging Deep
2 septembre 2020
Another super challenge looms, perhaps the greatest of the entire project: digging two tunnels beneath Sydney Harbour. In the early planning stages, the team actually considered dropping pre-fabricated tunnel sections down onto the floor of the harbour one by one, lowering them from barges, which was the way the road tunnel under the harbour was built.
Épisode 4 - Fast Tracked
9 septembre 2020
We follow architect Ross de la Motte, seeing that his vision for the stations has finally come to light. He has gone to great lengths to design stations that benefit from natural light and airflow, minimising the need for additional power. Has he been successful?
Épisode 1 - Great Expectations
3 avril 2025
An extension is now underway to get people the rest of the way into the centre of Australia's biggest city, including a new tunnel crossing deep under Sydney Harbour. "From a construction point of view it's a nextlevel challenge - even bigger and more complex," says Sydney Metro chief executive Peter Regan.
Épisode 2 - Down And Dirty
10 avril 2025
As Australia's largest transport project gets underway, we go back under Sydney Harbour to check out history in the making as the construction of the twin metro rail tunnels continues deep under the surface.
Épisode 3 - Testing Times
17 avril 2025
With 30 kilometres of tunnelling finished, it's time to start building railway stations, laying tracks and testing driverless trains. At Australia's busiest railway station, Central Station, the pedestrian subway known as Central Walks comes to life.
Épisode 4 - Countdown To Launch
24 avril 2025
After a decade of planning, construction and testing, the moment of truth arrives: the biggest transport infrastructure project in Australian history is nearly complete. More than 60,000 people from around the world worked on Sydney Metro and the teams are in their final stages of preparation.
Vidéos
Sydney's Super Tunnel official trailer
28/03/2025
Aucun avis pour le momment...